  • 6/1/2025
Building Information Modeling (BIM) is crucial for construction due to its numerous benefits, including:

Improved accuracy: Reduced errors and clashes through detailed modeling.
Enhanced collaboration: Better communication and coordination among stakeholders.
Increased efficiency: Streamlined workflows and reduced rework.
Cost savings: Minimized waste, reduced material costs, and improved budgeting.
Better decision-making: Data-driven insights for informed decisions.
Improved safety: Identification of potential safety hazards and mitigation.
Faster project delivery: Accelerated construction timelines.

BIM's importance lies in its ability to transform the construction industry by:

Digitalizing workflows
Improving collaboration
Enhancing accuracy

Category

📚
Learning
Transcript
00:00why is building information modeling important in construction get your
00:07answers building information modeling BIM the information technology supported
00:13working method is gaining increasing importance BIM is being increasingly
00:19employed particularly in the design of building technology and in the process
00:24of maintenance during the operational stage this ensures more efficient
00:29workflows shorter planning and construction times and better
00:34collaboration between all those involved a study presented in June 2019 by
00:41auditors and corporate consultants shows that BIM is demanded in more and more
00:46calls for tender these include in the field of technical building equipment the
00:51implementation planning for construction projects in general the production and
00:57geometric visualization of a virtual building model and the capture of all
01:02the data relevant to a building around half of all construction companies
01:06already have experience of BIM and just under 80 percent intend to apply this
01:12method of working in the next few years if engineering practices architects
01:18construction companies and installers aim to remain in the market in future they
01:24should orchestrate and develop their BIM expertise now the opinion is frequently
01:29heard however that 3d planning is already a BIM integration time is pressing a
01:35planner or an architect will only be able to handle a BIM project successfully by
01:41using structured information management and the developer only by using the
01:46specifications set out in client information requirements through open
01:51standards and specifications for BIM it will be possible in future for a
01:55database encompassing all manufacturers to make planning easier it will
02:00promote standardization and provision of product data in compliance with the
02:05building smart data dictionary on the international characteristic
02:10features server for example the illumination level of an illuminant will be
02:15given an unambiguous international code which each manufacturer will use as
02:20its orientation in this way planners trade workers and operators will have a
02:26unique and traceable documentation and revision system during the operating
02:31stage up to maintenance planning and beyond the lifecycle
02:45principle four to the
02:49possible
02:51for example
02:52in the workplace
02:53for the
02:55Bay Area
02:56we have a center of the
02:58partners as well
02:59in the marketplace
03:00we have the
03:01partners
03:02the
03:04demo
03:06between
03:07any

Recommended