Skip to playerSkip to main contentSkip to footer
  • 6/6/2025
Reasi (J&K), June 06, 2025 (ANI): Speaking on USBRL bridge link, Railway Board Executive Director of Information and Publicity Dilip Kumar on June 06 said thatthe bridge across Chenab River is a historic engineering marvel. “Today, PM will dedicate USBRL (Udhampur-Srinagar-Baramulla Rail Link) project to the nation. Besides this, PM will also inaugurate two important bridges, world’s highest railway arch bridge - Chenab bridge and India’s first cable-stayed rail bridge, Anji bridge...This is a 272 km project, an electrified project under which we have built 36 tunnels, 943 bridges. Katra-Banihal section will be especially known for bridges and tunnels because 97.42 km area of this 111-km section will pass through either a bridge or through a tunnel. This also has the longest tunnel of Indian railways, T50 - it is around 13 km in length. The bridge across Chenab River is a historic engineering marvel, we have surpassed Eiffel Tower (in height) and this bridge is 359 km high...A total of 29,800 metric tons of steel has been used on this bridge. It is located in seismic zone 5 but this has been built in a way that it can stand even strong tremors. The bridge will remain intact even in strong winds...Near Anji Bridge, wind speed is around 225 kmph. So, that bridge has been also been designed according to that...That bridge has 96 cables and 849 metric ton steel has been used in its construction and 725 km length and 331 km high...,” said Dilip Kumar.

Category

🗞
News
Transcript
00:00ुपुष्व
00:30is complete. You can know that this is the 272 km. This is the electrified
00:36area. We have 36 big tunnels and 943 bridges. We will go to the bridge and tunnels.
00:50This is 111 km. It is 97.42 km. It is either bridge or tunnel.
00:58There is a north service area. This is the largest tunnel T-50.
01:05The chain is about 13 km. The mountain is thegrave.
01:12The tunnel is the largest tunnel. The tunnel is much past.
01:19The tunnel is the 355 meters. The tunnel is 5 meters.
01:23This is the design of the bridge which is a seismic zone of 5, but it has been made by the
01:33speed of the bridge.
01:36In the same way, the bridge will be built in the same way.
01:42The bridge will be built in the same way.
01:44The bridge will be built in the same way.
01:50foreign

Recommended