00:00The Department of Public Works and Highways or DPWH announced that the road was repaired at Pangil or Pangil Bay Bridge in Mindanao on Monday, December 2 at 5 p.m.
00:14The road was opened to motorists at 9 p.m. to normalize the traffic flow.
00:21The emergency repairs started on December 1 at an area of more than 3 kilometers of road that was affected by overloaded vehicles.
00:30According to DPWH, the integrity of the road structure was not affected.
00:36To ensure its long-lasting quality, they ordered the contractor to submit a repair plan for the improvement of asphalt and waterproofing.
00:46The road connects Tanggub City in Misamis Occidental and Bayanang Tubod in Lanao del Norte.