The ongoing construction of the new road includes the installation of a buried twin drainage system with dimensions of 5x7 feet. This advanced drainage solution is designed to efficiently manage stormwater runoff, prevent flooding, and enhance road durability. The twin-pipe system ensures optimal water flow, reducing erosion and maintaining structural integrity. Built with high-quality materials, the underground network is strategically placed to support long-term infrastructure needs. The project follows strict engineering standards to ensure reliability and sustainability. Once completed, the drainage system will significantly improve road safety and performance, even during heavy rainfall, while minimizing maintenance requirements.