Skip to playerSkip to main contentSkip to footer
  • 6/20/2025
ప్రయోగాత్మకంగా మ్యాజిక్‌ డ్రెయిన్ నిర్మాణం -పల్లెల్లో మురుగు కాల్వల సమస్యకు పరిష్కారం

Category

🗞
News
Transcript
00:00There was a magic drain that was made in the water.
00:06There was a magic drain that was created in the water.
00:10In a pilot project, there was a magic drain that was created in the project.
00:15There was no mistake that this was made in the water.
00:20This means that over the time, we had made this magic drain.
00:27He looks very bad for this magic drain.
00:31He looks very bad to see the other drain and drag him along the drain.
00:39I am here to find one spot at airport.
00:45It's well to find another spot at 30 meters.
00:50My first time I came here, I was to find one spot from the road.
00:56This is the design for the Viet, which is the design.
01:05This is the design for a half meters of CC road.
01:10We have 75mm to 100mm OTG.
01:16We will introduce the first layer as shown.
01:18Every pound of thru-lift will have a track on the set and place it will be before we pass.
01:222x2, 2 meters per hour, and then it will have a track on the ground.
01:27And all the top 1.2 meters per hour.
01:30Look to the top 1.5 mm and there is a track.
01:32The bottom line is 1.5 mm and a rock.
01:34The bottom line is 1.75 mm and 1.25 mm.
01:38This top is 22.58 mm.
01:39And the bottom line is 4 layers.
01:43The bottom line is 4.5 mm.
01:44This is a game changer.
02:14The
02:18K
02:27K
02:28K
02:30K
02:32K
02:34K
02:36K
02:38K
02:40K
02:42K
02:43K
02:44K
02:44.
02:46.
02:58.
03:00.
03:02.
03:04.
03:06.
03:08.
03:12.
03:13.
03:14.
03:17.
03:19.
03:20.
03:21.
03:26.
03:34.
03:36.
03:37.
03:38.
03:39.
03:40.
03:41.
03:42.
03:43local
03:56engineer
04:00for
04:01engineering
04:02speech
04:04situation
04:07screen
04:08screen
04:09screen
04:41You

Recommended