India's Polar Satellite Launch Vehicle (PSLV) launched the EOS-09 satellite from Satish Dhawan Space Centre on Saturday at 8:29 p.m. EDT (0029 GMT or 5:59 a.m. India Standard Time on Sunday, May 18).
00:39That's 15 seconds. Update performance normal. There's a magnificent liftoff. The morning sky made brighter by the PSLV. EOS 09 on its journey.
00:52The vibration of the rocket launch is indeed to this.
01:03Plus 40 seconds.
01:05Garjana karta hua PSLV C61. Aakash mein Poon Garjana se sab ko achambit karta hua. Apne Uddisht Kaksha ki aur ja raha hai.
01:20First stage for sharon is a minute.
01:23Pratham Charan ka nishpadan. Sabhi Tantra puri tarah saamanya kaare kata hua.
01:27Shar ground station currently tracking the launch vehicle and will continue to track till PS4 ignition around 500.
01:36Ground lead strap on separated. P2 change rot. ACPT2.
01:42Ground lead strap on ko yaan se prithak kar diya gaya hai.
01:46Is ghatna kram mein agla air lead strap on ko prithak kiya jana hai.
01:55The ground lead strap ons have been separated from the ongoing launch vehicle.
01:59Ground lead strap ons separated.
02:00And just now we have a confirmation that the air lead strap ons have also been jettisoned.
02:05Trivendram station joined for the tracking.
02:15Action time for PS1 is 112 seconds for this mission.
02:18First stage separated. Second stage engine started.
02:21The second stage has commenced its operation.
02:39152.5 seconds action time for this mission.
02:42The hydrate of unsymmetrical di-methyl hydrazine is the same.
03:12Is the fuel and di-nitrogen tetroxide is the oxidizer.
03:16Both of which merely need to come into contact to be able to burn.
03:19They are called hypergolic propellants.
03:21Vikas engine with a thrust capability of 73.9 tons powers this stage.
03:29Abhi abhi is ki pushti ki gai.
03:31Second stage performance normal.
03:33Current altitude is 168 kilometers.
03:49Closed loop guidance has been initiated and the payload fairing has been jettisoned.
03:54This is a purpose for this mission.
04:06This is a part of the mission.
04:08maurisha street state ground stations
04:11humtak yaan ke aankhde
04:12upladh kara raha raha hai
04:14vartaman mein shahar tatha
04:16trivendram state ground stations
04:18isse purnitea track
04:20kare raha hai
04:21plus 4 minutes
04:25we are 240 seconds into launch
04:28dhuti echaran ka nishpadan
04:37puritra samanya kushikshanoh mein
04:39humm dhekhenge
04:40dhuti echaran ka karekaal
04:42samapth hoote huye
04:43tathah isse yaan se prithak
04:45kar diya jayega
04:46second stage separated
04:49third stage ignited
04:51jaisa ki apekshitha
04:55dhuti echaran ko yaan se prithak
04:57kar diya gaya hai
04:57or uske turant baad hi
04:59third stage performance normal
05:03prajolan shuru ho chuka hai
05:04the third stage of pslv has been ignited and it's performing normal
05:12hundred and twenty two seconds or two minutes approximately is the action time
05:17ps3 adds significant relative velocity to the launch vehicle
05:26it is increased from 4 km per second to 6 km per second at the time of its burnout
05:33yana tiriti charan hai pslv ka is ka karekaal lagbaag 102 s aquilo ga iis dhoraan yaa kul 480 kN ka vronod utpan Dhuti kira raha hai is dhoraan dhisha nirredharan ke liye flex nozzel control ka prayoke kerte huye yaa apna dhisha nirredharan ka raha hai iya dahi yoa asked if you have to go to over the air iya to go to the air