The City of Lakewood, California, hired Tetra Tech to design a new stormwater capture project that will improve water quality in the Los Cerritos Channel by removing pollutants conveyed within stormwater. The project consists of an air-inflated rubber dam diversion system to re-direct all runoff from the channel through a pre-treatment system to remove trash, debris, and sediment.