Dunya News- Pakistan's first extra dosed cable stayed bridge

  • 10 years ago
It's Pakistan's first extra dosed cable stayed bridge. GRC Private Limited hired foreighn technical staff from Taiwan who are working with our Pakistani engineers. This is the master piece of GRC Private Limited. The project consists of 473 m long bridge portion and 452 m approach roads. The Work Breakdown Structure of the project has been divided into following parts: East Side Approach Viaduct Earth Quake Memorial Bridge West Side Approach ViaductsIt's Pakistan's first extra dosed cable stayed bridge. GRC Private Limited hired foreighn technical staff from Taiwan who are working with our Pakistani engineers. This is the master piece of GRC Private Limited. The project consists of 473 m long bridge portion and 452 m approach roads. The Work Breakdown Structure of the project has been divided into following parts: East Side Approach Viaduct Earth Quake Memorial Bridge West Side Approach Viaducts

Recommended